Locations & Installed Capacities of the Plants
It is proposed to commission the Plants in the selected locations in two phases to achieve the total installed capacity of 1200 TPD of Rice Stubble processing. 600TPD shall be implemented in Phase 1 with six lines of 100TPD to be commissioned at the mentioned locations below followed by equivalent capacities at each of the above mentioned locations or at different locations in the second Phase. equivalent capacities at each of the above mentioned locations or at different locations in the second Phase.